US 97ALT over ENTIAT RIVER

14.3 N JCT US 2 · County 007, Washington · Built 1959 · 2 Lanes · 7,739 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000NJ0000000
Year Built
1959
Length
123.7 m (405.8 ft)
Max Span
50.3 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
7,739
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,050,000
Total Project Cost
$8,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.