IRR BIA RTE 140 over TOPPENISH CREEK
1.6KM SOUTH OF WHITE SWAN · County 077, Washington · Built 1986 · 2 Lanes · 400 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
46.334136, -120.732819
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 40 years old.
Nearby Bridges
IRR BIA RTE 127 over TOPPENISH CREEK
Built 1986
POM POM RD. over TOPPENISH CREEK
Built 1998
FORT SIMCOE RD. over DRY WASH
Built 1989
MARION DRAIN over TOPPENISH CREEK
Built 1983
FORT ROAD over DRY WASH
Built 1946
MARION DRAIN RD. over DRY WASH
Built 1974
FORT ROAD over DRAIN
Built 1946
PINE CONE RD. over AGENCY CREEK
Built 1974
White Swan Road W over Agency Creek
Built 1966
WESLEY RD. over SIMCOE CREEK
Built 1960
Bridge Details
- Structure #
- 00000000000P116
- Year Built
- 1986
- Length
- 25 m (82 ft)
- Max Span
- 12.2 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.