FORT ROAD over DRAIN

0.19 W.W.STEPHENSON · County 077, Washington · Built 1946 · 2 Lanes · 2,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0003082B0000000
Year Built
1946
Length
6.7 m (22 ft)
Max Span
6.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,250
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$578,000
Total Project Cost
$1,155,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.