POM POM RD. over TOPPENISH CREEK

0.55 S. OF MARION DRAIN · County 077, Washington · Built 1998 · 2 Lanes · 89 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
086509000000000
Year Built
1998
Length
26.5 m (86.9 ft)
Max Span
24.7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
89
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,751,000
Total Project Cost
$3,502,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.