POM POM RD. over TOPPENISH CREEK
0.55 S. OF MARION DRAIN · County 077, Washington · Built 1998 · 2 Lanes · 89 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.341475, -120.711733
This bridge is in worse condition than 5.6% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 28 years old.
Nearby Bridges
MARION DRAIN over TOPPENISH CREEK
Built 1983
IRR BIA RTE 140 over TOPPENISH CREEK
Built 1986
MARION DRAIN RD. over DRY WASH
Built 1974
FORT SIMCOE RD. over DRY WASH
Built 1989
IRR BIA RTE 127 over TOPPENISH CREEK
Built 1986
FORT ROAD over DRAIN
Built 1946
FORT ROAD over DRY WASH
Built 1946
SHAKER CHURCH ROAD over TOPPENISH CREEK
Built 1977
White Swan Road W over Agency Creek
Built 1966
STEPHENSON RD. over AGENCY CREEK
Built 1998
Bridge Details
- Structure #
- 086509000000000
- Year Built
- 1998
- Length
- 26.5 m (86.9 ft)
- Max Span
- 24.7 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 89
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,751,000
- Total Project Cost
- $3,502,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.