FORT SIMCOE RD. over DRY WASH
00.13 E WESLEY RD · County 077, Washington · Built 1989 · 2 Lanes · 488 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
46.346306, -120.751581
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 37 years old.
Nearby Bridges
IRR BIA RTE 127 over TOPPENISH CREEK
Built 1986
IRR BIA RTE 140 over TOPPENISH CREEK
Built 1986
POM POM RD. over TOPPENISH CREEK
Built 1998
PINE CONE RD. over AGENCY CREEK
Built 1974
FORT ROAD over DRY WASH
Built 1946
White Swan Road W over Agency Creek
Built 1966
MARION DRAIN over TOPPENISH CREEK
Built 1983
HAWK RD over CREEK
Built 1900
W. White Swan Rd. over Simcoe Crk. East Fork
Built 1966
W. White Swan Road over Simco Creek
Built 2022
Bridge Details
- Structure #
- 081100000000000
- Year Built
- 1989
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 488
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $902,000
- Total Project Cost
- $1,805,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.