MARION DRAIN over TOPPENISH CREEK
00.61 E OF POM POM · County 077, Washington · Built 1983 · 2 Lanes · 95 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.346183, -120.697089
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 43 years old.
Nearby Bridges
POM POM RD. over TOPPENISH CREEK
Built 1998
MARION DRAIN RD. over DRY WASH
Built 1974
SHAKER CHURCH ROAD over TOPPENISH CREEK
Built 1977
IRR BIA RTE 140 over TOPPENISH CREEK
Built 1986
FORT ROAD over DRAIN
Built 1946
FORT ROAD over DRY WASH
Built 1946
FORT SIMCOE RD. over DRY WASH
Built 1989
IRR BIA RTE 127 over TOPPENISH CREEK
Built 1986
STEPHENSON RD. over AGENCY CREEK
Built 1998
FORT ROAD over TOPPENISH CREEK
Built 1954
Bridge Details
- Structure #
- 082125000000000
- Year Built
- 1983
- Length
- 15.5 m (50.9 ft)
- Max Span
- 14.6 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 95
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,101,000
- Total Project Cost
- $2,202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.