STEPHENSON RD. over DRY WASH

00.22 S.BRANCH RD. · County 077, Washington · Built 1985 · 2 Lanes · 572 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
084445000000000
Year Built
1985
Length
7.6 m (24.9 ft)
Max Span
7.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
572
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$632,000
Total Project Cost
$1,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.