WESLEY RD. over SIMCOE CREEK
.13 N. of W. White Swan · County 077, Washington · Built 1960 · 2 Lanes · 1,150 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
46.384508, -120.754775
This bridge is in worse condition than 83.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 66 years old.
Nearby Bridges
White Swan Road W over Agency Creek
Built 1966
W. White Swan Road over Simco Creek
Built 2022
W. White Swan Rd. over Simcoe Crk. East Fork
Built 1966
WHITE SWAN RD. W. over SIMCOE CREEK W. FORK
Built 1966
HAWK RD over CREEK
Built 1900
WHITE SWAN RD. N. over SIMCOE CREEK
Built 1998
FORT ROAD over DRY WASH
Built 1946
PINE CONE RD. over AGENCY CREEK
Built 1974
TOWTNUK ROAD over SIMCOE CREEK
Built 1974
FORT ROAD over DRAIN
Built 1946
Bridge Details
- Structure #
- 079763000000000
- Year Built
- 1960
- Length
- 14 m (45.9 ft)
- Max Span
- 6.7 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,150
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,011,000
- Total Project Cost
- $2,022,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.