PR 2 216.1 KM over RAMPS TO PR 2
11.35 KMS SW OF PONCE · County 113, Puerto Rico · Built 2008 · 4 Lanes · 42,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
17.985239, -66.709244
This bridge is in worse condition than 61.3% of bridges in County 113. The average bridge in Puerto Rico is 0 years old; this one is 18 years old.
Nearby Bridges
PR 2 216.8 KM over UNNAMED CREEK
Built 2008
PR 2 WESB 214.5 KM over CONNECTOR PR 2 TO PR 127
Built 1991
PR 2 EASB 214.5 KM over PR 127 0.1 KM
Built 1991
PR 127 17.4 KM over DISCHARGE FROM PLANT
Built 1935
PR 127 over TALLABOA RIVER
Built 1935
PR 2 EASTBOUND over PR 385
Built 1968
PR 2 WESTBOUND over PR 385
Built 1968
PR-2 220.5 KM over CARRETERA HACIA EL TUQUE
Built 2020
PR 2 212.4 KM over TALLABOA RIVER
Built 1968
PR 2 WBND 211.9 KM over PR 384 0.1 KM
Built 1968
Bridge Details
- Structure #
- 028931
- Year Built
- 2008
- Length
- 35.5 m (116.5 ft)
- Max Span
- 34 m
- Width
- 31.9 m (104.7 ft)
- Lanes
- 4
- Daily Traffic
- 42,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.