PR 2 WBND 211.9 KM over PR 384 0.1 KM
6 KM EAST OF GUAYANILLA · County 111, Puerto Rico · Built 1968 · 2 Lanes · 18,550 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
18.012794, -66.733211
This bridge is in worse condition than 20% of bridges in County 111. The average bridge in Puerto Rico is 0 years old; this one is 58 years old.
Nearby Bridges
PR 2 ESBD 211.9 KM over PR 384 0.1 KM
Built 1968
PR 2 212.4 KM over TALLABOA RIVER
Built 1968
PR 2 EASTBOUND over PR 385
Built 1968
PR 2 WESTBOUND over PR 385
Built 1968
PR 127 over TALLABOA RIVER
Built 1935
PR 127 17.4 KM over DISCHARGE FROM PLANT
Built 1935
PR 2 EASB 214.5 KM over PR 127 0.1 KM
Built 1991
PR 2 WESB 214.5 KM over CONNECTOR PR 2 TO PR 127
Built 1991
PR 384 3.1 KM over TALLABOA RIVER
Built 1972
PR 2 WBD KM 209.1 over WATERWAY
Built 1968
Bridge Details
- Structure #
- 009472
- Year Built
- 1968
- Length
- 8.3 m (27.2 ft)
- Max Span
- 8.3 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 18,550
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $28,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.