PR 2 WESTBOUND over PR 385
6.8 KM S E OF GUAYANILLA · County 111, Puerto Rico · Built 1968 · 2 Lanes · 34,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.011756, -66.72595
This bridge is in worse condition than 56% of bridges in County 111. The average bridge in Puerto Rico is 0 years old; this one is 58 years old.
Nearby Bridges
PR 2 EASTBOUND over PR 385
Built 1968
PR 2 212.4 KM over TALLABOA RIVER
Built 1968
PR 2 ESBD 211.9 KM over PR 384 0.1 KM
Built 1968
PR 2 WBND 211.9 KM over PR 384 0.1 KM
Built 1968
PR 127 over TALLABOA RIVER
Built 1935
PR 127 17.4 KM over DISCHARGE FROM PLANT
Built 1935
PR 2 WESB 214.5 KM over CONNECTOR PR 2 TO PR 127
Built 1991
PR 2 EASB 214.5 KM over PR 127 0.1 KM
Built 1991
PR 384 3.1 KM over TALLABOA RIVER
Built 1972
PR 2 216.1 KM over RAMPS TO PR 2
Built 2008
Bridge Details
- Structure #
- 009412
- Year Built
- 1968
- Length
- 43.8 m (143.7 ft)
- Max Span
- 18.2 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 34,400
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $140,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.