PR 127 over TALLABOA RIVER
6.6 KM EAST OF GUAYANILLA · County 111, Puerto Rico · Built 1935 · 2 Lanes · 4,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
18.005275, -66.731119
This bridge is in worse condition than 84% of bridges in County 111. The average bridge in Puerto Rico is 0 years old; this one is 91 years old.
Nearby Bridges
PR 2 WBND 211.9 KM over PR 384 0.1 KM
Built 1968
PR 2 EASTBOUND over PR 385
Built 1968
PR 127 17.4 KM over DISCHARGE FROM PLANT
Built 1935
PR 2 212.4 KM over TALLABOA RIVER
Built 1968
PR 2 ESBD 211.9 KM over PR 384 0.1 KM
Built 1968
PR 2 WESTBOUND over PR 385
Built 1968
PR 2 EASB 214.5 KM over PR 127 0.1 KM
Built 1991
PR 2 WESB 214.5 KM over CONNECTOR PR 2 TO PR 127
Built 1991
PR 384 3.1 KM over TALLABOA RIVER
Built 1972
PR 2 216.1 KM over RAMPS TO PR 2
Built 2008
Bridge Details
- Structure #
- 000831
- Year Built
- 1935
- Length
- 62 m (203.4 ft)
- Max Span
- 19.4 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 4,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $739,000
- Total Project Cost
- $923,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.