PR 127 17.4 KM over DISCHARGE FROM PLANT
6 KM SOUTH OF PE¥UEL · County 111, Puerto Rico · Built 1935 · 2 Lanes · 4,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
18.000828, -66.724206
This bridge is in worse condition than 20% of bridges in County 111. The average bridge in Puerto Rico is 0 years old; this one is 91 years old.
Nearby Bridges
PR 2 EASB 214.5 KM over PR 127 0.1 KM
Built 1991
PR 2 WESB 214.5 KM over CONNECTOR PR 2 TO PR 127
Built 1991
PR 127 over TALLABOA RIVER
Built 1935
PR 2 EASTBOUND over PR 385
Built 1968
PR 2 WESTBOUND over PR 385
Built 1968
PR 2 212.4 KM over TALLABOA RIVER
Built 1968
PR 2 WBND 211.9 KM over PR 384 0.1 KM
Built 1968
PR 2 ESBD 211.9 KM over PR 384 0.1 KM
Built 1968
PR 2 216.1 KM over RAMPS TO PR 2
Built 2008
PR 2 216.8 KM over UNNAMED CREEK
Built 2008
Bridge Details
- Structure #
- 013591
- Year Built
- 1935
- Length
- 13.2 m (43.3 ft)
- Max Span
- 3.3 m
- Width
- 20.7 m (67.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $55,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.