PR 2 216.8 KM over UNNAMED CREEK
11.15 KM SW OF PONCE · County 113, Puerto Rico · Built 2008 · 10 Lanes · 42,200 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
17.984586, -66.707897
This bridge is in worse condition than 27.4% of bridges in County 113. The average bridge in Puerto Rico is 0 years old; this one is 18 years old.
Nearby Bridges
PR 2 216.1 KM over RAMPS TO PR 2
Built 2008
PR 2 WESB 214.5 KM over CONNECTOR PR 2 TO PR 127
Built 1991
PR 2 EASB 214.5 KM over PR 127 0.1 KM
Built 1991
PR 127 17.4 KM over DISCHARGE FROM PLANT
Built 1935
PR 127 over TALLABOA RIVER
Built 1935
PR-2 220.5 KM over CARRETERA HACIA EL TUQUE
Built 2020
PR 2 EASTBOUND over PR 385
Built 1968
PR 2 WESTBOUND over PR 385
Built 1968
PR 2 212.4 KM over TALLABOA RIVER
Built 1968
PR 2 WBND 211.9 KM over PR 384 0.1 KM
Built 1968
Bridge Details
- Structure #
- 028061
- Year Built
- 2008
- Length
- 16.3 m (53.5 ft)
- Max Span
- 2.7 m
- Width
- 103.3 m (338.9 ft)
- Lanes
- 10
- Daily Traffic
- 42,200
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.