W CHURCHIL 0.60 KM over PIEDRAS RIVER
EL SEñORIAL RIO PIE · County 127, Puerto Rico · Built 1965 · 4 Lanes · 27,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
18.366856, -66.063253
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 61 years old.
Nearby Bridges
PR 177 9.6 KM over PIEDRAS RIVER
Built 1989
PR 52 NORTHBOUND over PR 177
Built 1979
PR 52 SOUTHBOUND over PR 177 8.4 KM
Built 1979
PR 199 over PIEDRAS RIVER
Built 1987
PR 199 19.1 KM over GUANO RIVER
Built 1989
PR 52 NORTHBOUND over PR 199
Built 1977
PR 52 NTHBD KM 3.2 over LOCAL ROAD
Built 1977
PR 52 SOUTHBOUND over PR 199
Built 1977
PR 52 SOUTHBOUND over LOCAL ROAD
Built 1977
PR 8838 over PR 52
Built 1976
Bridge Details
- Structure #
- 021461
- Year Built
- 1965
- Length
- 51.2 m (168 ft)
- Max Span
- 14.6 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 27,100
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,827,000
- Total Project Cost
- $2,192,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.