PR 52 SOUTHBOUND over PR 199

4 KM S W OF RIO PIEDRAS · County 127, Puerto Rico · Built 1977 · 4 Lanes · 120,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
012532
Year Built
1977
Length
59.2 m (194.2 ft)
Max Span
28.3 m
Width
28.6 m (93.8 ft)
Lanes
4
Daily Traffic
120,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$890,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.