PR 52 SOUTHBOUND over PR 177 8.4 KM

2.1 MI S W OF RIO PIEDRAS · County 127, Puerto Rico · Built 1979 · 4 Lanes · 76,650 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012512
Year Built
1979
Length
62.7 m (205.7 ft)
Max Span
29.8 m
Width
28.9 m (94.8 ft)
Lanes
4
Daily Traffic
76,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$761,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.