PR 8838 over PR 52

6 KM S W OF RIO PIEDRAS · County 127, Puerto Rico · Built 1976 · 2 Lanes · 16,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012601
Year Built
1976
Length
126.1 m (413.7 ft)
Max Span
40.6 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
16,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,313,000
Total Project Cost
$2,775,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.