PR 52 NTHBD KM 3.2 over LOCAL ROAD
5 KM SOUTH OF RIO PIEDRAS · County 127, Puerto Rico · Built 1977 · 3 Lanes · 60,150 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
18.358625, -66.0701
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 49 years old.
Nearby Bridges
PR 52 NORTHBOUND over PR 199
Built 1977
PR 52 SOUTHBOUND over LOCAL ROAD
Built 1977
PR 52 SOUTHBOUND over PR 199
Built 1977
PR 199 19.1 KM over GUANO RIVER
Built 1989
PR 199 over PIEDRAS RIVER
Built 1987
OFF PR 176 7.5 KM over PIEDRAS RIVER
Built 1972
PR-52 over CALLE TULIP
Built 2020
W CHURCHIL 0.60 KM over PIEDRAS RIVER
Built 1965
PR 52 SOUTHBOUND over PR 177 8.4 KM
Built 1979
PR 52 NORTHBOUND over PR 177
Built 1979
Bridge Details
- Structure #
- 012622
- Year Built
- 1977
- Length
- 31.3 m (102.7 ft)
- Max Span
- 30 m
- Width
- 17.9 m (58.7 ft)
- Lanes
- 3
- Daily Traffic
- 60,150
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.