PR 177 9.6 KM over PIEDRAS RIVER

1.5 KM INT PR 52 & PR · County 127, Puerto Rico · Built 1989 · 4 Lanes · 24,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
018981
Year Built
1989
Length
45.5 m (149.3 ft)
Max Span
21.6 m
Width
17.7 m (58.1 ft)
Lanes
4
Daily Traffic
24,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$113,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.