13 STREET over DO¥A ANA CREEK
BETWEEN 36 & 40 SO ST · County 127, Puerto Rico · Built 1960 · 2 Lanes · 1,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
18.395433, -66.088275
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 66 years old.
Nearby Bridges
54 S.E. STREET over JOSEFINA CREEK
Built 1950
DE DIEGO AVENUE over DO%A ANA CREEK
Built 1955
PR 21 over JOSEFINA CREEK
Built 1965
21 ST 0.1 KM over DOÑA ANA CREEK
Built 1960
9 S.E. STREET over JOSEFINA CREEK
Built 1950
21 STREET 0.01 KM over JOSEFINA CREEK
Built 1940
29 ST S.E 0.1 KM over DO¥A ANA CREEK
Built 1955
AMRCO MRNDA 1.6 KM over DOÑA ANA CREEK
Built 1950
31 S.E. STREET over JOSEFINA CREEK
Built 1964
AMRCO MIRDA 2.2 KM over JOSEFINA CREEK
Built 1950
Bridge Details
- Structure #
- 021401
- Year Built
- 1960
- Length
- 10.9 m (35.8 ft)
- Max Span
- 10.9 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,100
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $249,000
- Total Project Cost
- $311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.