54 S.E. STREET over JOSEFINA CREEK
REPARTO METROPOLITANO RP · County 127, Puerto Rico · Built 1950 · 2 Lanes · 2,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
18.394853, -66.090972
This bridge is in worse condition than 58.7% of bridges in County 127. The average bridge in Puerto Rico is 0 years old; this one is 76 years old.
Nearby Bridges
13 STREET over DO¥A ANA CREEK
Built 1960
DE DIEGO AVENUE over DO%A ANA CREEK
Built 1955
PR 21 over JOSEFINA CREEK
Built 1965
21 ST 0.1 KM over DOÑA ANA CREEK
Built 1960
9 S.E. STREET over JOSEFINA CREEK
Built 1950
PR 20 1.2 KM over PR 17 PI%ERO AVE 7.7 KM
Built 1989
PR 20 1.9 KM over PR 19 & RAILROAD 0.2
Built 1997
RAMP 20 TO PR 177 over LOCAL ROAD URBAN TRAIN
Built 1997
PR 20 TO PR 177 over PR 19 & RAILROAD
Built 1997
21 STREET 0.01 KM over JOSEFINA CREEK
Built 1940
Bridge Details
- Structure #
- 021421
- Year Built
- 1950
- Length
- 7.7 m (25.3 ft)
- Max Span
- 3.6 m
- Width
- 12.5 m (41 ft)
- Lanes
- 2
- Daily Traffic
- 2,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $89,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.