IRR BIA RTE 78 over CHAMISA WASH
EAST EDGE OF ZIA PUEBLO · County 043, New Mexico · Built 1997 · 2 Lanes · 150 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.505533, -106.718411
This bridge is in worse condition than 48.3% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 29 years old.
Nearby Bridges
IRR BIA RTE 78 over JEMEZ RIVER
Built 1979
US-550 over ARROYO OJITO
Built 1975
IRR/US-550 over UNNAMED WATERWAY
Built 1975
Golf Course Road over Arroyo Delas Calabacilla
Built 1985
US-550 over UNNAMED WATERWAY
Built 1970
IRR/US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over ARROYO PIEDRA PARADA
Built 1979
US-550 over UNNAMED WATERWAY
Built 1975
US-550 over UNNAMED WATERWAY
Built 1970
Bridge Details
- Structure #
- 00000000000M140
- Year Built
- 1997
- Length
- 49.7 m (163.1 ft)
- Max Span
- 19.1 m
- Width
- 16.3 m (53.5 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.