US-550 over UNNAMED WATERWAY
18.8 MI NW OF JCT I-25 · County 043, New Mexico · Built 1975 · 4 Lanes · 9,796 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.520017, -106.775108
This bridge is in worse condition than 62.8% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 51 years old.
Nearby Bridges
US-550 over ARROYO PIEDRA PARADA
Built 1979
US-550 over RIO SALADO
Built 1979
US-550 over UNNAMED WATERWAY
Built 1979
IRR/US-550 over UNNAMED WATERWAY
Built 1975
US-550 over ARROYO OJITO
Built 1975
US-550 over UNNAMED WATERWAY
Built 1977
IRR BIA RTE 78 over JEMEZ RIVER
Built 1979
IRR BIA RTE 78 over CHAMISA WASH
Built 1997
NM-4 over JEMEZ RIVER
Built 1981
US-550 over UNNAMED WATERWAY
Built 1977
Bridge Details
- Structure #
- 000000000007563
- Year Built
- 1975
- Reconstructed
- 1999
- Length
- 9.5 m (31.2 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 9,796
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $131,000
- Total Project Cost
- $197,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.