NM-4 over JEMEZ RIVER
1.8 MI N OF JCT US 550 · County 043, New Mexico · Built 1981 · 2 Lanes · 4,975 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.573939, -106.758311
This bridge is in worse condition than 62.8% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 45 years old.
Nearby Bridges
IRR/NM-4 over UNNAMED WATERWAY
Built 1941
IRR/NM-4 over UNNAMED WATERWAY
Built 1941
IRR/NM-4 over UNNAMED WATERWAY
Built 1941
US-550 over RIO SALADO
Built 1979
IRR BIA ROUTE 81 over POISON OAK WASH
Built 1996
US-550 over UNNAMED WATERWAY
Built 1979
US-550 over UNNAMED WATERWAY
Built 1977
IRR BIA RTE 82 over JEMEZ RIVER
Built 2023
US-550 over ARROYO PIEDRA PARADA
Built 1979
US-550 over UNNAMED WATERWAY
Built 1975
Bridge Details
- Structure #
- 000000000008364
- Year Built
- 1981
- Length
- 86.1 m (282.5 ft)
- Max Span
- 28.2 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 4,975
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.