IRR BIA RTE 78 over JEMEZ RIVER
AT ZIA PUEBLO · County 043, New Mexico · Built 1979 · 2 Lanes · 600 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
35.50325, -106.724272
This bridge is in worse condition than 96.1% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 47 years old.
Nearby Bridges
IRR BIA RTE 78 over CHAMISA WASH
Built 1997
IRR/US-550 over UNNAMED WATERWAY
Built 1975
US-550 over ARROYO OJITO
Built 1975
IRR/US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
Golf Course Road over Arroyo Delas Calabacilla
Built 1985
US-550 over ARROYO PIEDRA PARADA
Built 1979
US-550 over UNNAMED WATERWAY
Built 1975
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
Bridge Details
- Structure #
- 00000000000M133
- Year Built
- 1979
- Length
- 99.3 m (325.8 ft)
- Max Span
- 24.5 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.