IRR/US-550 over UNNAMED WATERWAY
14.9 MI NW OF JCT I-25 · County 043, New Mexico · Built 1970 · 4 Lanes · 27,379 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.472161, -106.691144
This bridge is in worse condition than 62.8% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 56 years old.
Nearby Bridges
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
IRR BIA RTE 78 over CHAMISA WASH
Built 1997
US-550 over ARROYO OJITO
Built 1975
IRR/US-550 over UNNAMED WATERWAY
Built 1975
IRR BIA RTE 78 over JEMEZ RIVER
Built 1979
IRR/US-550 over UNNAMED WATERWAY
Built 1970
IRR/US-550 over UNNAMED WATERWAY
Built 1970
Golf Course Road over Arroyo Delas Calabacilla
Built 1985
Bridge Details
- Structure #
- 000000000007229
- Year Built
- 1970
- Length
- 23.8 m (78.1 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 27,379
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $458,000
- Total Project Cost
- $687,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.