IRR/US-550 over UNNAMED WATERWAY
11.75 MI NW OF JCT I-25 · County 043, New Mexico · Built 1970 · 4 Lanes · 27,379 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.434872, -106.656833
This bridge is in worse condition than 62.8% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 56 years old.
Nearby Bridges
IRR/US-550 over UNNAMED WATERWAY
Built 1970
I. S. RTE. 74 over JEMEZ RIVER
Built 2000
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
IRR/US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
43-4301 over Unnamed Waterway
Built 2006
Bridge Details
- Structure #
- 000000000007013
- Year Built
- 1970
- Reconstructed
- 1998
- Length
- 35.1 m (115.2 ft)
- Max Span
- 7.6 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 4
- Daily Traffic
- 27,379
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $398,000
- Total Project Cost
- $598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.