IRR/US-550 over UNNAMED WATERWAY
16.8 MI NW OF JCT I-25 · County 043, New Mexico · Built 1975 · 4 Lanes · 27,379 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
35.496417, -106.730428
This bridge is in worse condition than 62.8% of bridges in County 043. The average bridge in New Mexico is 0 years old; this one is 51 years old.
Nearby Bridges
US-550 over ARROYO OJITO
Built 1975
IRR BIA RTE 78 over JEMEZ RIVER
Built 1979
IRR BIA RTE 78 over CHAMISA WASH
Built 1997
IRR/US-550 over UNNAMED WATERWAY
Built 1970
US-550 over UNNAMED WATERWAY
Built 1970
US-550 over ARROYO PIEDRA PARADA
Built 1979
US-550 over UNNAMED WATERWAY
Built 1975
US-550 over UNNAMED WATERWAY
Built 1970
Golf Course Road over Arroyo Delas Calabacilla
Built 1985
US-550 over UNNAMED WATERWAY
Built 1970
Bridge Details
- Structure #
- 000000000007562
- Year Built
- 1975
- Length
- 12.8 m (42 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 27,379
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $176,000
- Total Project Cost
- $265,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.