31-0049 over RIO PUERCO
0.9 MI N OF N 11-49 · County 031, New Mexico · Built 1993 · 1 Lanes · 179 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.620817, -108.45595
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 33 years old.
Nearby Bridges
31-0049 over RIO PUERCO OF THE WEST
Built 1988
IRR BIA RTE N7055 over CHURCH CAMP WASH
Built 1988
IRR BIA RTE N11 over PINEDALE WASH
Built 1985
IRR BIA RTE N11 over RIO PUERCO WASH
Built 1985
NM-566 over RIO PUERCO (NORTH FORK)
Built 2024
31-0027 over UNNAMED WATERWAY
Built 1992
31-0077 over RIO PUERCO
Built 1995
NM-566 over UNNAMED WATERWAY
Built 1970
ROCKY CANYON ROAD over PUERCO RIVER
Built 2020
31-0077 over UNNAMED WATERWAY
Built 1995
Bridge Details
- Structure #
- 000000000008905
- Year Built
- 1993
- Length
- 33.7 m (110.6 ft)
- Max Span
- 5.9 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 179
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $62,000
- Total Project Cost
- $93,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.