31-0077 over RIO PUERCO
1.05 MI W NM-566 @ MP-5.5 · County 031, New Mexico · Built 1995 · 1 Lanes · 337 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.606497, -108.579125
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 31 years old.
Nearby Bridges
NM-566 over RIO PUERCO (NORTH FORK)
Built 2024
NM-566 over UNNAMED WATERWAY
Built 1970
31-0077 over UNNAMED WATERWAY
Built 1995
31-MC43 over NOSE ROCK WASH
Built 1977
IRR BIA RTE N11 over RIO PUERCO WASH
Built 1985
IRR BIA RTE N11 over PINEDALE WASH
Built 1985
31-MC43 over RIO PUERCO
Built 1980
IRR/US-491 over UNNAMED WATERWAY
Built 2018
31-Z001 over UNNAMED WATERWAY
Built 1950
NM-566 over Rio Puerco/BNSF R/R
Built 2024
Bridge Details
- Structure #
- 000000000008970
- Year Built
- 1995
- Length
- 33.6 m (110.2 ft)
- Max Span
- 6.2 m
- Width
- 4.1 m (13.5 ft)
- Lanes
- 1
- Daily Traffic
- 337
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $58,000
- Total Project Cost
- $87,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.