31-0077 over UNNAMED WATERWAY
5.6 MI W OF NM-566 MP-5.6 · County 031, New Mexico · Built 1995 · 1 Lanes · 337 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.632253, -108.611639
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 31 years old.
Nearby Bridges
31-MC43 over NOSE ROCK WASH
Built 1977
31-0077 over RIO PUERCO
Built 1995
NM-566 over RIO PUERCO (NORTH FORK)
Built 2024
NM-566 over UNNAMED WATERWAY
Built 1970
31-MC43 over RIO PUERCO
Built 1980
IRR/US-491 over UNNAMED WATERWAY
Built 2018
IRR BIA RTE N11 over RIO PUERCO WASH
Built 1985
IRR BIA RTE N11 over PINEDALE WASH
Built 1985
IRR BIA RTE N9660 over WASH
Built 1976
31-Z001 over UNNAMED WATERWAY
Built 1950
Bridge Details
- Structure #
- 000000000008983
- Year Built
- 1995
- Length
- 24.5 m (80.4 ft)
- Max Span
- 6.1 m
- Width
- 4.1 m (13.5 ft)
- Lanes
- 1
- Daily Traffic
- 337
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $42,000
- Total Project Cost
- $64,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.