NM-566 over RIO PUERCO (NORTH FORK)
6.5 MI N OF NM-118 · County 031, New Mexico · Built 2024 · 2 Lanes · 3,241 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
35.611617, -108.560356
This bridge is in worse condition than 44.3% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 2 years old.
Nearby Bridges
31-0077 over RIO PUERCO
Built 1995
NM-566 over UNNAMED WATERWAY
Built 1970
IRR BIA RTE N11 over RIO PUERCO WASH
Built 1985
IRR BIA RTE N11 over PINEDALE WASH
Built 1985
31-0077 over UNNAMED WATERWAY
Built 1995
31-MC43 over NOSE ROCK WASH
Built 1977
IRR BIA RTE N7055 over CHURCH CAMP WASH
Built 1988
31-MC43 over RIO PUERCO
Built 1980
IRR/US-491 over UNNAMED WATERWAY
Built 2018
31-0049 over RIO PUERCO OF THE WEST
Built 1988
Bridge Details
- Structure #
- 000000000009983
- Year Built
- 2024
- Length
- 72.5 m (237.9 ft)
- Max Span
- 24.1 m
- Width
- 14.3 m (46.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,241
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.