NM-566 over Rio Puerco/BNSF R/R
0.1 MI N OF NM-118 · County 031, New Mexico · Built 2024 · 2 Lanes · 3,241 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
35.532417, -108.606667
This bridge is in worse condition than 44.3% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 2 years old.
Nearby Bridges
I-40 WBL over Rio Puerco
Built 1965
I-40 EBL over Rio Puerco
Built 1965
31-Z001 over UNNAMED WATERWAY
Built 1950
I-40 WBL over BNSF R/R Spur
Built 1963
I-40 WB over BNSF R/R Spur
Built 1963
I-40 EBL over BNSF R/R
Built 1963
I-40 EBL over BNSF R/R Spur
Built 1963
I-40 EBL/WBL over SUNDANCE ROAD
Built 1965
I-40 WBL over GOV ORD BASE/LOCAL RD.
Built 1963
I-40 EBL over GOV ORD BASE/LOCAL RD.
Built 1963
Bridge Details
- Structure #
- 000000000009982
- Year Built
- 2024
- Length
- 115.4 m (378.6 ft)
- Max Span
- 49.1 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,241
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.