I-40 WBL over GOV ORD BASE/LOCAL RD.
9.2 MI E OF JCT US-491 · County 031, New Mexico · Built 1963 · 2 Lanes · 25,439 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
35.524664, -108.583786
This bridge is in worse condition than 92.7% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 63 years old.
Nearby Bridges
I-40 EBL over GOV ORD BASE/LOCAL RD.
Built 1963
NAVAJO BLVD over SOUTH FORK PUERCO RIVER
Built 1943
I-40 EBL over BNSF R/R
Built 1963
I-40 EBL over BNSF R/R Spur
Built 1963
I-40 WBL over BNSF R/R Spur
Built 1963
I-40 WB over BNSF R/R Spur
Built 1963
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1963
31-Z001 over UNNAMED WATERWAY
Built 1950
I-40 EBL over Rio Puerco
Built 1965
I-40 WBL over Rio Puerco
Built 1965
Bridge Details
- Structure #
- 000000000006365
- Year Built
- 1963
- Reconstructed
- 2001
- Length
- 28.7 m (94.2 ft)
- Max Span
- 11 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 25,439
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $160,000
- Total Project Cost
- $330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.