I-40 EBL over BNSF R/R
3.2 MI W OF NM-400 · County 031, New Mexico · Built 1963 · 2 Lanes · 25,439 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
35.527528, -108.594067
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 63 years old.
Nearby Bridges
I-40 EBL over BNSF R/R Spur
Built 1963
I-40 WBL over BNSF R/R Spur
Built 1963
I-40 WB over BNSF R/R Spur
Built 1963
31-Z001 over UNNAMED WATERWAY
Built 1950
I-40 EBL over GOV ORD BASE/LOCAL RD.
Built 1963
I-40 WBL over GOV ORD BASE/LOCAL RD.
Built 1963
I-40 EBL over Rio Puerco
Built 1965
I-40 WBL over Rio Puerco
Built 1965
NAVAJO BLVD over SOUTH FORK PUERCO RIVER
Built 1943
NM-566 over Rio Puerco/BNSF R/R
Built 2024
Bridge Details
- Structure #
- 000000000006363
- Year Built
- 1963
- Reconstructed
- 1985
- Length
- 38.7 m (127 ft)
- Max Span
- 14.6 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 25,439
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.