I-40 EBL over Rio Puerco
8.0 MI E OF JCT US-491 · County 031, New Mexico · Built 1965 · 2 Lanes · 25,439 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.529628, -108.604661
This bridge is in worse condition than 62.6% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 61 years old.
Nearby Bridges
I-40 WBL over Rio Puerco
Built 1965
NM-566 over Rio Puerco/BNSF R/R
Built 2024
31-Z001 over UNNAMED WATERWAY
Built 1950
I-40 WB over BNSF R/R Spur
Built 1963
I-40 WBL over BNSF R/R Spur
Built 1963
I-40 EBL over BNSF R/R
Built 1963
I-40 EBL over BNSF R/R Spur
Built 1963
I-40 EBL over GOV ORD BASE/LOCAL RD.
Built 1963
I-40 WBL over GOV ORD BASE/LOCAL RD.
Built 1963
NAVAJO BLVD over SOUTH FORK PUERCO RIVER
Built 1943
Bridge Details
- Structure #
- 000000000006560
- Year Built
- 1965
- Length
- 47.2 m (154.9 ft)
- Max Span
- 10.2 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 25,439
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.