ROCKY CANYON ROAD over PUERCO RIVER
3.5miles N OF MARIANO LAK · County 031, New Mexico · Built 2020 · 2 Lanes · 213 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
35.611389, -108.314444
This bridge is in worse condition than 44.3% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 6 years old.
Bridge Details
- Structure #
- 0000N34780B0494
- Year Built
- 2020
- Length
- 28.3 m (92.8 ft)
- Max Span
- 27.4 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 213
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.