31-0027 over UNNAMED WATERWAY
4.2 MI N OF I-40 MM 44.7 · County 031, New Mexico · Built 1991 · 1 Lanes · 337 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
35.488747, -108.322333
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 35 years old.
Nearby Bridges
I-40 East over Coolidge
Built 2023
I-40 EBL/WBL over FOSTER CANYON
Built 1957
I-40 E/WBL over SMITH CANYON
Built 1958
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1936
I-40 EBL/WBL/RAMP over UNNAMED WATERWAY
Built 1957
NM-122 over I-40 EBLS/WBLS @ MP 47.9
Built 2017
I-40 EBL/WBL over FOUR MILE CANYON
Built 1957
FR-4004 over I-40 EBLS/WBLS @mp 39.9
Built 1987
I-40 WBL over UNNAMED WATERWAY
Built 1963
I-40 EBL over UNNAMED WATERWAY
Built 1963
Bridge Details
- Structure #
- 000000000008865
- Year Built
- 1991
- Length
- 15.4 m (50.5 ft)
- Max Span
- 7.9 m
- Width
- 4.4 m (14.4 ft)
- Lanes
- 1
- Daily Traffic
- 337
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $29,000
- Total Project Cost
- $43,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.