I-40 EBL/WBL over FOUR MILE CANYON
19.3 MI E OF JCT US-491 · County 031, New Mexico · Built 1957 · 4 Lanes · 24,647 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.473486, -108.419275
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 69 years old.
Nearby Bridges
FR-4004 over I-40 EBLS/WBLS @mp 39.9
Built 1987
I-40 EBL/WBL over SIX MILE CANYON
Built 1957
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1957
I-40 E/WBL over SMITH CANYON
Built 1958
I-40 EBL/WBL over FOSTER CANYON
Built 1957
I-40 East over Coolidge
Built 2023
NM-118 over I-40 EBLS/WBLS mp 36.8
Built 2014
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1958
I-40 E/WBL over UNNAMED WATERWAY
Built 1958
31-0027 over UNNAMED WATERWAY
Built 1992
Bridge Details
- Structure #
- 000000000006006
- Year Built
- 1957
- Length
- 9.8 m (32.2 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 24,647
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.