I-25 SBL over Spikey Arroyo

19.4 N Sierra/Socorro CL · County 053, New Mexico · Built 1981 · 2 Lanes · 6,438 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000007672
Year Built
1981
Length
34.1 m (111.9 ft)
Max Span
11.6 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
6,438
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.