I-25 NBL over SPIKEY ARROYO

19.5 M N OF SIERRA CL · County 053, New Mexico · Built 1966 · 2 Lanes · 6,438 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006679
Year Built
1966
Reconstructed
2007
Length
44.8 m (147 ft)
Max Span
14.6 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
6,438
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.