NM-1 over SPIKEY ARROYO
19.5 MI N OF SIERRA C/L · County 053, New Mexico · Built 1931 · 2 Lanes · 40 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
33.697906, -107.051692
This bridge is in worse condition than 95.2% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 95 years old.
Nearby Bridges
I-25 NBL over SPIKEY ARROYO
Built 1966
I-25 SBL over Spikey Arroyo
Built 1981
NM-1 over UNNAMED WATERWAY
Built 1931
I-25 NBL over UNNAMED WATERWAY
Built 1963
I-25 SB over UNNAMED WATERWAY
Built 1981
NM-1 over UNNAMED WATERWAY
Built 1931
NM-1 over UNNAMED WATERWAY
Built 1931
NM-1 over UNNAMED WATERWAY
Built 1931
I-25 SBL over UNNAMED WATERWAY
Built 1981
NM-1 over UNNAMED WATERWAY
Built 1937
Bridge Details
- Structure #
- 000000000001653
- Year Built
- 1931
- Length
- 61.8 m (202.8 ft)
- Max Span
- 7.6 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $239,000
- Total Project Cost
- $358,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.