NM-1 over UNNAMED WATERWAY
18.3 MI N OF SIERRA C/L · County 053, New Mexico · Built 1931 · 2 Lanes · 40 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
33.684836, -107.065247
This bridge is in worse condition than 79.4% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 95 years old.
Nearby Bridges
NM-1 over SPIKEY ARROYO
Built 1931
I-25 NBL over SPIKEY ARROYO
Built 1966
I-25 SBL over Spikey Arroyo
Built 1981
NM-1 over UNNAMED WATERWAY
Built 1937
I-25 SBL over UNNAMED WATERWAY
Built 1981
I-25 NBL over UNNAMED WATERWAY
Built 1966
NM-1 over MULLIGAN GULCH
Built 1937
I-25 NBL over MULLIGAN GULCH
Built 1966
I-25 SBL over MULLIGAN GULCH
Built 1981
I-25 NBL over UNNAMED WATERWAY
Built 1963
Bridge Details
- Structure #
- 000000000001654
- Year Built
- 1931
- Length
- 31.3 m (102.7 ft)
- Max Span
- 7.6 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $122,000
- Total Project Cost
- $184,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.