I-25 SBL over MULLIGAN GULCH
16 MI N SIERRA/SOCORRO CL · County 053, New Mexico · Built 1981 · 2 Lanes · 6,438 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.661478, -107.093378
This bridge is in worse condition than 61.9% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 45 years old.
Nearby Bridges
I-25 NBL over MULLIGAN GULCH
Built 1966
NM-1 over MULLIGAN GULCH
Built 1937
I-25 SBL over UNNAMED WATERWAY
Built 1981
I-25 NBL over UNNAMED WATERWAY
Built 1966
NM-1 over UNNAMED WATERWAY
Built 1937
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1968
NM-1 over UNNAMED WATERWAY
Built 1931
NM-107 over I-25 NBL and SBL
Built 1968
I-25 NB over SIMON CANYON
Built 1937
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1937
Bridge Details
- Structure #
- 000000000007671
- Year Built
- 1981
- Length
- 100.9 m (331 ft)
- Max Span
- 20.7 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 6,438
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.