NM-107 over I-25 NBL and SBL
Junction I-25 & NM-107 · County 053, New Mexico · Built 1968 · 2 Lanes · 242 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.636717, -107.120775
This bridge is in worse condition than 61.9% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 58 years old.
Nearby Bridges
I-25 NB over SIMON CANYON
Built 1937
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1968
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1937
I-25 NB/SB over UNNAMED WATERWAY
Built 1937
NM-1 over SHEEP CREEK
Built 1937
I-25 SBL over MULLIGAN GULCH
Built 1981
I-25 NBL over SHEEP CREEK
Built 1968
I-25 NBL over MULLIGAN GULCH
Built 1966
I-25 SBL over SHEEP CREEK
Built 1968
NM-1 over MULLIGAN GULCH
Built 1937
Bridge Details
- Structure #
- 000000000006781
- Year Built
- 1968
- Length
- 90.2 m (295.9 ft)
- Max Span
- 21.9 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 242
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.