NM-1 over UNNAMED WATERWAY
1.2 M S OF I-25/EXIT 124 · County 053, New Mexico · Built 1931 · 2 Lanes · 40 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.717828, -107.021675
This bridge is in worse condition than 61.9% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 95 years old.
Nearby Bridges
NM-1 over UNNAMED WATERWAY
Built 1931
NM-1 over UNNAMED WATERWAY
Built 1931
I-25 NBL over UNNAMED WATERWAY
Built 1963
I-25 SB over UNNAMED WATERWAY
Built 1981
NM-178 over I-25 NBL and SBL
Built 1967
NM-1 over UNNAMED WATERWAY
Built 1931
NM-1 over SPIKEY ARROYO
Built 1931
I-25 NBL over SPIKEY ARROYO
Built 1966
I-25 SBL over Spikey Arroyo
Built 1981
I-25 NBL/SBL over RYAN HILL CANYON
Built 1963
Bridge Details
- Structure #
- 000000000001651
- Year Built
- 1931
- Length
- 31.3 m (102.7 ft)
- Max Span
- 7.6 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $775,000
- Total Project Cost
- $902,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.