NH109 over NINETEEN MILE BAY

5.0 MI SE MOULTONBORO TL · County 003, New Hampshire · Built 1993 · 2 Lanes · 2,518 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
025902010010000
Year Built
1993
Length
8.5 m (27.9 ft)
Max Span
6.1 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
2,518
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.