SODOM ROAD over MELVIN RIVER
1.5 MI. RTE. 109A · County 003, New Hampshire · Built 1970 · 2 Lanes · 534 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.695325, -71.284322
This bridge is in worse condition than 54.9% of bridges in County 003. The average bridge in New Hampshire is 0 years old; this one is 56 years old.
Nearby Bridges
NEW ROAD over MELVIN RIVER
Built 1940
NH109 over MELVIN RIVER
Built 1921
HIGH STREET over MELVIN RIVER
Built 1977
COUNTY ROAD over MELVIN RIVER
Built 1936
NH109 over NINETEEN MILE BAY
Built 1993
LONG ISLAND ROAD over LAKE WINNIPESAUKEE
Built 1988
NH109 over SHANNON BROOK
Built 1929
TUFTONBORO ROAD over BEECH RIVER
Built 1997
VALLEY ROAD over DAN HOLE RIVER
Built 2018
BEAN MOUNTAIN ROAD over LOVELL RIVER
Built 1999
Bridge Details
- Structure #
- 025901340008900
- Year Built
- 1970
- Length
- 7.6 m (24.9 ft)
- Max Span
- 6.7 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 534
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.