NH109 over MELVIN RIVER

6.5 MI FROM WOLFEBORO TL · County 003, New Hampshire · Built 1921 · 2 Lanes · 2,151 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
025901450007000
Year Built
1921
Reconstructed
1992
Length
9.1 m (29.9 ft)
Max Span
7.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
2,151
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.